Central Arizona College | Hoyt Hall Science and engineering

Location: Coolidge, Arizona

Completion: 06/18

Size: 28,000 sf


The new Science Building on CAC’s Signal Peak Campus is located just north of Pence Center, within the campus’ academic core. Given the site limitations, the 28,000 sq ft is configured as an efficient 2-story building with programmed spaces divided across both levels. Nine Teaching Labs, associated Prep Spaces, a STEM Classroom, and 19 Faculty Offices will live within the new Science building, as well as Student Lounge spaces on both levels, encouraging student and faculty interaction. Exterior shaded spaces have been created to allow students to relax and socialize in a comfortable outdoor environment. Existing science building is set to be demolished and the site will be re-vegetated with natural landscape.

Project Facts

Client | Central Arizona College

Cost | $16.4M

Contractor | DPR

Type | CMAR



Graphic-Science-Site-Plan.jpg

Team

Dan Childers

Alyssa Robinson

Tom Reilly

Chris Kelly

Sara Yehia

Joe Salvatore

John Kane

in collaboration with Studio8


Related Projects